0
  • Alternative installation
Alternative installation methods are preferably used for overland sections, as the advantages of these methods are particularly significant for long trench lengths with few connections. Low-digging methods include in particular ploughing and milling. Both methods are extremely economical due to their high laying performance. GEROfit® pressure pipes with additive protective coating according to PAS 1075, Type 3 meet the requirements for both scratch resistance and stress cracking resistance.

Alternative installation

Alternative installation methods

  • Gerodur ploughing method Computer graphics

    Ploughing

    In the ploughing method, the soil is displaced by a plough blade and the pipeline is placed on the bottom of the soil.
  • Gerodur milling process Computer graphics

    Milling

    In the milling process, a pipe trench is cut into the subsoil by machine and the pipeline is laid on the bottom of the trench.

Want to find out more?
We look forward to hearing from you.
Gerodur MPM Kunststoffverarbeitung GmbH & Co. KG
01844 Neustadt i. Sa.
Privacy settings
This website uses cookies. Some of them are necessary, while others help us to improve this website and your experience.
I agree and can revoke or change my consent at any time with effect for the future.