0

EMDS Protective pipes for the TESLA - Gigafactory

Supply line to the TESLA plant from the Freienbrink substation
EMDS Protective pipes for installation using the Horizontal Directional Drilling method
As part of the development and preparation measures for the new production site of the TESLA Gigafactory Berlin-Brandenburg, new 110 kV lines were laid from the transformer station in Freienbrink to the construction site in Grünheide. For this purpose, EMDS protective pipes made by Gerodur were installed using the trenchless HDD method, into which the power cables were later pulled.

TECHNICAL SPECIFICATIONS

Type of pipe
 
EMDS Protective pipe basic performance class PE-HD+
DN/­OD 200 x 18,2 mm SDR 11 in black /­ coils of 100 m
Installation
 
Horizontal Directional Drillling (HDD)
Trenchless
Contact
 
Anwendungstechnik Gerodur
Andreas-Schubert-Straße 6
D-01844 Neustadt in Sachsen

Telefon: +49 3596 58330
E-Mail: anwendungstechnik@gerodur.de
  • EMDS PE-HD+ Kabelschutzrohre TESLA Gigafactory Ringbunde 1
  • EMDS PE-HD+ Kabelschutzrohre TESLA Werk Grünheide Spülbohren (HDD) Rohreinzug Rohrende
  • EMDS PE-HD+ Kabelschutzrohre - TESLA Gigafactory Transport Ringbunde
EMDS PE-HD+ Kabelschutzrohre TESLA Gigafactory Ringbunde 1EMDS PE-HD+ Kabelschutzrohre TESLA Werk Grünheide Spülbohren (HDD) Rohreinzug RohrendeEMDS PE-HD+ Kabelschutzrohre - TESLA Gigafactory Transport Ringbunde