Rehabilitation of a potable water pipeline with GEROfit® R in Polenz / Neustadt Saxony
Replacement pipeline for drinking water supply
Teichweg / Am Wasserberg / Dresdner Straße
ZVWV Pirna / Sebnitz
Teichweg / Am Wasserberg / Dresdner Straße
ZVWV Pirna / Sebnitz
The Special purpose water supply association Pirna / Sebnitz is continuing the comprehensive rehabilitation of the water supply in Neustadt and the neighbouring communities. In 2018, the main pipes and house connections at the Polenz branch will be renewed. In order to avoid costly earthworks and traffic restrictions, large sections of the route are being laid parallel to the existing old route using the HDD flush drilling method. Among other things, the busy Dresdner / Wilhelm-Kaulisch-Straße intersection, the bed of the river Polenz and the foundations of the Polenz bridge have to be crossed. The GEROfit® pipe made by Gerodur with additive protective jacket, which is suitable for the HDD method, was used as a straight lenghts or coils.
TECHNICAL SPECIFICATIONS
Type of pipe
Potable water pressure pipe PE 100-RC mit Schutzmantel
with protective jacket - PAS 1075 - Type 3
180 x 16.4 mm / SDR 11 - Straight lenghts of 12,0m
63 x 5.8 mm / SDR 11 - Coils of 50m
40 x 3.7 mm / SDR 11 - Coils of 50m
with protective jacket - PAS 1075 - Type 3
180 x 16.4 mm / SDR 11 - Straight lenghts of 12,0m
63 x 5.8 mm / SDR 11 - Coils of 50m
40 x 3.7 mm / SDR 11 - Coils of 50m
Installation
Without sand bedding
Horizontal Directional Drillling (HDD)
Horizontal Directional Drillling (HDD)
Contact
Anwendungstechnik Gerodur
Andreas-Schubert-Straße 6
D-01844 Neustadt in Sachsen
Telefon: +49 3596 58330
E-Mail: anwendungstechnik@gerodur.de
Andreas-Schubert-Straße 6
D-01844 Neustadt in Sachsen
Telefon: +49 3596 58330
E-Mail: anwendungstechnik@gerodur.de