Temporary water overhead line on support structure
Rehabilitation of main transport pipeline
BA 2 TWL Wickerstedt
Apoldaer Wasser GmbH
BA 2 TWL Wickerstedt
Apoldaer Wasser GmbH
In the second construction phase, the main supply line (grey cast iron) in the Wickerstedt area, which was in need of repair, was renovated in 2023. Similar to the first construction section in Eckartsberga, the existing route of the old pipeline was used for the new installation of a GEROfit® R protective jacket pipe. Here, too, the old pipeline had to be shut down for the duration of the pipe installation and a temporary drinking water pipeline installed. In this project, the exposed interim pipeline was partly erected on up to 5.50 m high support structures, so that the route could be routed without affecting any traffic routes to be crossed.
TECHNICAL SPECIFICATIONS
Type of pipe
GEROfit® R - Protective jacket pressure pipe
Potable water PE100-RC Type 3 PAS 1075
450 x 40.9 mm SDR 11
RCprotect® - PE100-RC Pressure pipe
Potable water Type 2 PAS 1075
225 x 20.5 mm SDR 11
Potable water PE100-RC Type 3 PAS 1075
450 x 40.9 mm SDR 11
RCprotect® - PE100-RC Pressure pipe
Potable water Type 2 PAS 1075
225 x 20.5 mm SDR 11
Installation
Without sand bedding
Relining
Open Space Installation
Relining
Open Space Installation
Contact
Anwendungstechnik Gerodur
Andreas-Schubert-Straße 6
D-01844 Neustadt in Sachsen
Telefon: +49 3596 58330
E-Mail: anwendungstechnik@gerodur.de
Andreas-Schubert-Straße 6
D-01844 Neustadt in Sachsen
Telefon: +49 3596 58330
E-Mail: anwendungstechnik@gerodur.de